project spotlight
Driveway Modification & Apron Expansion
Project Details
Nicholas, a homeowner on Coachman Drive in Bordentown, NJ, reached out looking to modify his driveway for better functionality. The right side of his driveway angled sharply to the left to match the smaller width of the driveway apron, making it difficult to use the full space. His goal was to create a straight, full-width driveway leading directly to the street.
For this project, we:
Removed the two bottom sections of the driveway
Removed and expanded the driveway apron to match the full width of the driveway
Replaced 30 feet of curb centered in front of the driveway for a seamless transition
Now, Nicholas can fully utilize his driveway without maneuvering around an awkward angle, making parking much easier. He was extremely happy with the result!